Inspection Ready

At long last, the stairs and railings are done. I put the final coat of finish on this afternoon and we are now ready for inspection. In total, the railings took about 3 weeks of build time, and the stairs about the same. If I had known just how much work would be required, I … Continue reading Inspection Ready